source · filing
2025/2026 Base Residual Auction Results
src_pjm_2024_capacity
reliability 0.95
authors: PJM Interconnection
published: 2024-07
Notes
RTO primary-auction document, audited. Direct market evidence of AI/datacenter load tightening the eastern US grid.
Warrants from this source (2)
- weight0.75
method: direct_measurement · locator: 2025/2026 BRA clearing results
- weight0.80
method: direct_measurement · locator: 2025/2026 BRA clearing-price escalation